An official (looking) LB Lewisham Planning Notice for the works at the subway has appeared outside the station although there is no corresponding Application that can be found on Alcolnet.
The Notice states that work will commence on 5 November (2012) and will have a duration of six months.
This is a substantial change from information last provided that promised commencement of works in mid to late October (2012) with a duration of only two months.
Obviously the Notice is insufficiently detailed to advise on for how long the subway will be closed in that six month period.
Does anyone know the details of this revised programme and can we be told ?
Is it to be the case that the Forest Hill is to be divided over Christmas or have arrangements been made with LOROL to permit the use of the pedestrian bridge on the station for non-passenger foot traffic?