SE23.com - The Official Forum for Forest Hill & Honor Oak, London SE23
Online since 2002   11,000+ members   72,000+ posts

Home | SE23 Topics | Businesses & Services | Wider Topics | Offered/Wanted/Lost/Found | About SE23.com | Advertising | Contact | |
 Armstrong & Co Solicitors



Post Reply  Post Topic 
Upcoming Rail Engineering Works Update thread
Author Message
rbmartin


Posts: 1,088
Joined: Nov 2007
Post: #1
17-03-2024 04:41 AM

Saturday 23rd/Sunday 24th March.

Forest Hill/Honor Oak Park: Normal service.

Catford Bridge/Lower Sydenham: Reduced service via Lewisham every 30 minutes on Saturday, normal service on Sunday.

Crofton Park/Catford: Normal service on Saturday. Sunday sees services diverted between Bickley and Sevenoaks additionally calling at Petts Wood and Orpington.

EASTER WEEKEND

Forest Hill/Honor Oak Park: Good Friday, Easter Saturday and Easter Monday. Southern will operate between London Bridge and Victoria. London Overground will operate a reduced service between New Cross Gate and West Croydon/Crystal Palace every 30 minutes. Replacement buses operate between New Cross Gate and Dalston Junction not calling at Rotherhithe, Shadwell and Wapping, but call additionally at Bermondsey and Tower Gateway.

A special service will operate between London Bridge and West Croydon on Easter Sunday operated by London Overground. The first train to London Bridge is at 0919, then 0948 and then at x18 and x48 past each hour until 2248.

Trains from London Bridge start at 0954 and then x24 and x54 past each hour until 2254.

Trains to West Croydon start at 0824, then 0854, 0924, with a long gap until 1009, 1039, then x09 and x39 past each hour with the last train at 2309.

THERE ARE NO TRAINS TO CRYSTAL PALACE OR VICTORIA ON EASTER SUNDAY. USE LOCAL BUSES.


Catford Bridge/Lower Sydenham: Saturday service on Good Friday and Easter Monday. Normal service on Easter Saturday and Sunday.

Crofton Park/Catford: Replacement buses between Herne Hill and Bromley South throughout the Easter period.

This post was last modified: 17-03-2024 04:44 AM by rbmartin.

Find all posts by this user Quote this message in a reply

Friends of Blythe Hill Fields


Messages In This Topic
RE: Upcoming Rail Engineering Works Update thread - rbmartin - 17-03-2024 04:41 AM

Possibly Related Topics ...
Topic: Author Replies: Views: Last Post
  Rail engineering works stepover 30 32,838 01-04-2015 08:47 PM
Last Post: Erekose
  Engineering Works Sherwood 0 3,193 02-01-2013 08:45 PM
Last Post: Sherwood
  Engineering works on the trains this weekend michael 0 3,937 11-09-2008 08:47 PM
Last Post: michael
  Rail engineering works: 26/27th April 2008 blushingsnail 7 11,057 12-05-2008 10:01 AM
Last Post: blushingsnail