SE23.com - The Official Forum for Forest Hill & Honor Oak, London SE23
Online since 2002   11,000+ members   73,000+ posts

Home | SE23 Topics | Wider Topics | Offered/Wanted/Lost/Found | About SE23.com | Advertising | Contact | |
Canvas & Cream  Armstrong & Co Solicitors



Post Reply  Post Topic 
Pages (25): « First < Previous 21 22 23 24 [25] Last »
Upcoming Rail Engineering Works Update thread
Author Message
rbmartin


Posts: 1,222
Joined: Nov 2007
Post: #481
09-09-2025 04:23 PM

A quick summary of the New Year week during the Christmas holidays. The timetable is provisional, so may be changed the closer we get to Christmas.

Southern services return on December 27th (Saturday). The Windrush line will be operating a full service to Crystal Palace and West Croydon overnight on NYE as part of the Night Overground.

On the Hayes line, there will be an every 15 minute service to Catford Bridge and Lower Sydenham from Charing Cross until 0221 on NYE. These will alternate between Hayes and Orpington via Beckenham Junction.

The Thameslink line to Crofton Park and Catford is a normal service. Last train from Blackfriars on NYE is 2321 with no special service.

Find all posts by this user Quote this message in a reply
Pages (25): « First < Previous 21 22 23 24 [25] Last »

Friends of Blythe Hill Fields


Possibly Related Topics ...
Topic: Author Replies: Views: Last Post
  Rail engineering works stepover 30 45,405 01-04-2015 08:47 PM
Last Post: Erekose
  Engineering Works Sherwood 0 4,492 02-01-2013 08:45 PM
Last Post: Sherwood
  Engineering works on the trains this weekend michael 0 5,106 11-09-2008 08:47 PM
Last Post: michael
  Rail engineering works: 26/27th April 2008 blushingsnail 7 14,804 12-05-2008 10:01 AM
Last Post: blushingsnail