SE23.com - The Official Forum for Forest Hill & Honor Oak, London SE23
Online since 2002

Home | SE23 Topics | Wider Topics | Offered/Wanted/Lost/Found | About SE23.com | Advertising | Contact | |
Canvas & Cream  Armstrong & Co Solicitors



Post Reply  Post Topic 
Upcoming Rail Engineering Works Update thread
Author Message
rbmartin


Posts: 1,261
Joined: Nov 2007
Post: #1
20-12-2025 07:30 PM

Christmas and New Year 2025/26. 22nd Dec-4th Jan 2026, Part 1.

Forest Hill/Honor Oak Park: A Saturday service operates on Southern on 22-24th, so the first train to London Bridge is the 0557 to London Bridge.

On Monday and Tuesday, the final Southern service from London Bridge is the 2358 to Streatham Hill. Replacement buses from London Bridge leave at 0020 and 0035.

Additional peak services aren't operating to London Bridge in the morning and Sutton in the evening.

Christmas Eve sees final services on Southern at 1958 from London Bridge and Victoria at 1950.

Windrush line services are operating to a Saturday timetable on Monday, Tuesday and Christmas Eve but finish earlier.

The final train southbound leaves Highbury and Islington at 2141, Whitechapel at 2155 and Canada Water at 2202.

Boxing Day, a special service operates every 15 minutes on the Windrush line between Highbury & Islington and West Croydon only. First northbound service is at 0717 to Highbury & Islington and 0737 to West Croydon. Final trains are at at 2301 from West Croydon and 2317 from Highbury & Islington, Whitechapel at 2331 and Canada Water at 2338.

The Elizabeth line is closed on Boxing Day, so use Canada Water for the Jubilee or Whitechapel for the Hammersmith & City and District lines which are open.

Normal weekend service on Saturday 27th/Sunday 28th with a Saturday timetable on 29th, 30th and 31st.

New Year's Eve sees the final Southern service from London Bridge as per usual at 0035, however the Windrush line is operating the Night Overground to West Croydon and Crystal Palace every 10 mins (20 to Crystal Palace and between Penge West and West Croydon).

New Year's Day is a Saturday service on the Windrush line and a Sunday service on Southern.

Friday 2nd Jan is a Saturday service with a normal service on Saturday 3rd and Sunday 4th.

I'll post the changes for the other stations shortly.

Find all posts by this user Quote this message in a reply

Friends of Blythe Hill Fields


Messages In This Topic
RE: Upcoming Rail Engineering Works Update thread - rbmartin - 20-12-2025 07:30 PM

Possibly Related Topics ...
Topic: Author Replies: Views: Last Post
  Rail engineering works stepover 30 49,766 01-04-2015 07:47 PM
Last Post: Erekose
  Engineering Works Sherwood 0 5,102 02-01-2013 07:45 PM
Last Post: Sherwood
  Engineering works on the trains this weekend michael 0 5,890 11-09-2008 07:47 PM
Last Post: michael
  Rail engineering works: 26/27th April 2008 blushingsnail 7 16,484 12-05-2008 09:01 AM
Last Post: blushingsnail