SE23.com - The Official Forum for Forest Hill & Honor Oak, London SE23
Online since 2002

Home | SE23 Topics | Wider Topics | Offered/Wanted/Lost/Found | About SE23.com | Advertising | Contact | |
Canvas & Cream  Armstrong & Co Solicitors



Post Reply  Post Topic 
Upcoming Rail Engineering Works Update thread
Author Message
rbmartin


Posts: 1,261
Joined: Nov 2007
Post: #1
18-07-2025 10:46 PM

Some good news on the Windrush line closure between the 11th-14th August.

It will only happen during the late evenings with services operating normally during the day.

Last train from Whitechapel will be at 2145 and Canada Water at 2153. After this time if you're travelling from Central London, you'll need to use Southern services from London Bridge or Victoria.

Windrush line services will operate between New Cross Gate and West Croydon/Crystal Palace from 2200.

Find all posts by this user Quote this message in a reply

Friends of Blythe Hill Fields


Messages In This Topic
RE: Upcoming Rail Engineering Works Update thread - rbmartin - 18-07-2025 10:46 PM

Possibly Related Topics ...
Topic: Author Replies: Views: Last Post
  Rail engineering works stepover 30 49,766 01-04-2015 07:47 PM
Last Post: Erekose
  Engineering Works Sherwood 0 5,102 02-01-2013 07:45 PM
Last Post: Sherwood
  Engineering works on the trains this weekend michael 0 5,890 11-09-2008 07:47 PM
Last Post: michael
  Rail engineering works: 26/27th April 2008 blushingsnail 7 16,486 12-05-2008 09:01 AM
Last Post: blushingsnail