SE23.com - The Official Forum for Forest Hill & Honor Oak, London SE23
Online since 2002   11,000+ members   73,000+ posts

Home | SE23 Topics | Wider Topics | Offered/Wanted/Lost/Found | About SE23.com | Advertising | Contact | |
Canvas & Cream  Armstrong & Co Solicitors



Post Reply  Post Topic 
Upcoming Rail Engineering Works Update thread
Author Message
rbmartin


Posts: 1,230
Joined: Nov 2007
Post: #1
21-11-2024 04:30 AM

I mentioned it in the thread back in September that Southern will be adding four trains per hour in the morning peak and two extra trains in the 5pm hour from December 16th.

To London Bridge, trains will be every 15 minutes from 0727 until 0927 with services operating at x13, x27, x43 and x57 past each hour.

After 0927, trains operate every 30 minutes to London Bridge at x27 and x57 past each hour.

From London Bridge, trains will depart at 1658 to Victoria, 1710 to Sutton, 1728 to Victoria, 1740 to Sutton and 1758 to Victoria. After 6pm it reverts to x28 and x58.

Find all posts by this user Quote this message in a reply

Friends of Blythe Hill Fields


Messages In This Topic
RE: Upcoming Rail Engineering Works Update thread - rbmartin - 21-11-2024 04:30 AM

Possibly Related Topics ...
Topic: Author Replies: Views: Last Post
  Rail engineering works stepover 30 46,936 01-04-2015 08:47 PM
Last Post: Erekose
  Engineering Works Sherwood 0 4,808 02-01-2013 08:45 PM
Last Post: Sherwood
  Engineering works on the trains this weekend michael 0 5,547 11-09-2008 08:47 PM
Last Post: michael
  Rail engineering works: 26/27th April 2008 blushingsnail 7 15,595 12-05-2008 10:01 AM
Last Post: blushingsnail