SE23.com - The Official Forum for Forest Hill & Honor Oak, London SE23
Online since 2002   11,000+ members   73,000+ posts

Home | SE23 Topics | Wider Topics | Offered/Wanted/Lost/Found | About SE23.com | Advertising | Contact | |
Canvas & Cream  Armstrong & Co Solicitors



Post Reply  Post Topic 
Upcoming Rail Engineering Works Update thread
Author Message
rbmartin


Posts: 1,230
Joined: Nov 2007
Post: #1
03-01-2024 11:45 PM

It's for resignalling works on the line into Victoria via Crystal Palace, so the Victoria to London Bridge service can't run. It's during half-term week in February.

They're also doing the signals on the line into London Bridge via Peckham Rye at the same time.

More information from Network Rail at https://www.networkrail.co.uk/running-th...-upgrades/

London Overground will operate throughout the works and apparently the Southern service will resume on Sunday 18th February. (There is also a limited early morning/late night service to and from London Bridge that week).

I'll post more about it in February when timetables are finalised.

This post was last modified: 03-01-2024 11:48 PM by rbmartin.

Find all posts by this user Quote this message in a reply

Friends of Blythe Hill Fields


Messages In This Topic
RE: Upcoming Rail Engineering Works Update thread - rbmartin - 03-01-2024 11:45 PM

Possibly Related Topics ...
Topic: Author Replies: Views: Last Post
  Rail engineering works stepover 30 46,936 01-04-2015 08:47 PM
Last Post: Erekose
  Engineering Works Sherwood 0 4,808 02-01-2013 08:45 PM
Last Post: Sherwood
  Engineering works on the trains this weekend michael 0 5,547 11-09-2008 08:47 PM
Last Post: michael
  Rail engineering works: 26/27th April 2008 blushingsnail 7 15,595 12-05-2008 10:01 AM
Last Post: blushingsnail