These are useful Michael.

As regards the former Bell Green Gas Works (Phases II & III), Perry Hill Sydenham, SE26, LB Lewisham remains remarkably silent on one or two very significant issues.

The Authority had secured s106 monies in the order of £950k as part of granting consent for the original development that included the erection of the original Savacentre (now re-branded Sainsbury's). Copies of the original agreement are still available online.

These monies had been earmarked to deal with the choke-point that exists where the roadway narrows at the overbridge at Southend Lane. It might be anticipated that these monies were intended to be used to replace the two lane overbridge with a wider bridge' thus widening the highway and provide easement and betterment to the traffic-flows around that area.

With regard to how realistic any estimates may or may not have been for the proposed bridge replacement/traffic easement measures, it would appear that LB Lewsiham has made no visible progress with the infrastructure owner (formerly Railtrack and now Network Rail) to deliver the required bridge works.

This leaves questions about these unaccounted-for monies.

Has the Authority secured the funds and is therefore holding them (unspent) for the purpose(s) intended?

Are plans being developed with the infrastructure owner to ensure the work is carried out ?

If the original purpose to which the monies were to be put is no longer deliverable, what alternative uses are being considered by the Authority for the easement of traffic problems around that entire location?

The necessity of significant improvement in traffic arrangements around the entire site is self evident.

Residents on all sides of the site have had endure several years of unacceptable and unnecessary traffic queuing, noise and pollution from the delayed traffic and the frustration of not being able to gain ready access to our own homes at weekends.

The chequered progress of the sites' developments may be attributable to several issues. However poor access to the site for destination shoppers is clearly one of them.

It is worthy of note that the developer of the proposed new Homebase has postponed (if not abandoned) plans for that site after having spent the larger amount of the total development costs on the site decontamination phase. It is almost certainly the case that current economic conditions played a role here. However, Homebase may have formed a view that their existing site on the A21 is more accessible than the the Bell Green site and then reaching a decision to advise the developer that the new site was no longer required.

These questions need to be addressed coherently in an over-arching fashion that embraces all the site issues in conjunction with future Strategic Planning matters.

Find all posts by this user Quote this message in a reply

Friends of Blythe Hill Fields


Messages In This Topic
Strategic Planning for Lewisham - michael - 25-11-2010, 11:10 AM
RE: Strategic Planning for Lewisham - jgdoherty - 26-11-2010 01:37 PM

Possibly Related Topics ...
Topic: Author Replies: Views: Last Post
  Lewisham Council approve "controversial" planning application samuelsen 1 4,506 10-11-2022 04:43 PM
Last Post: taymountgrange
  Strategic Planning for Forest Hill Town Centre michael 24 26,137 05-03-2015 07:40 AM
Last Post: Erekose
  Lewisham consults on planning policy Woody 1 4,257 19-03-2009 09:41 AM
Last Post: andrewr