16-04-2014, 10:25 AM
London Bridge shut over all 4 days of Easter, no southern trains stopping there. Fortunately the Overground is working on our route.
From Southern
Passengers advised to check before they travel as London Bridge station will be closed to Southern services for all four Easter holiday days.
Network Rail continues to rebuild London Bridge station as part of the Thameslink Programme. Part of this work requires engineering work to upgrade the track and signalling systems in and around the station, and work is taking place this Easter weekend (Friday 18th to Monday 21st April inclusive). As a result, no Southern services will call at London Bridge on these days.
From Southern
Passengers advised to check before they travel as London Bridge station will be closed to Southern services for all four Easter holiday days.
Network Rail continues to rebuild London Bridge station as part of the Thameslink Programme. Part of this work requires engineering work to upgrade the track and signalling systems in and around the station, and work is taking place this Easter weekend (Friday 18th to Monday 21st April inclusive). As a result, no Southern services will call at London Bridge on these days.