SE23 Forum

Full Version: Roadworks on South Circular
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
Does anybody have any idea why they have started works on the south circular (by the coop) at 22.00 hours with no sign of abating. Lots of drilling and hammering - it's driving me mad!!
At that time I would assume a gas/water/electricity problem.
Having a supply outage is usually more annoying than the noise.
Im sure the workmen would like to be in bed too. Especially with the temperature.
Reference URL's