SE23 Forum

Full Version: London Road/Honor Oak Road roadworks again
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
For the third time since the new year, the junction of Honor Oak Road with London Road is being dug up again by Thames Water for emergency works.

SGN also dug up the road by Esso a couple of weeks back and Thames Water repaired a leak by the flats on Eliot Bank.
According to TfL web page

"HONOR OAK PARK,SE23; Route P4 is on diversion towards Lewisham only until 23:59 Friday 31 March, Buses are diverted via Brockley Rise, missing stops Stondon Park / Honor Oak Park (HC) and Maclean Road (HN).

Buses towards Brixton are not affected."

31st March is a very long time for the diversion to be in place.
Thames Water are digging the same bit of pavement on London Road again, so temp lights at the Honor Oak Park junction return.
Doers that mean this weekends rail replacement bus will stop at Stondon Park/Honor Oak Park (HC) rather than the stop by Honor Oak Station (HB)?

The whole area seems to have been beset by leak after leak which takes longer and longer to repair.
Luckily the roadworks were completed this morning and the road back to normal by lunchtime today. (London Rd/Honor Oak Road junction).
Reference URL's