The road that passes N Dulwich station at Red Post Hill looks as if it will re-open very shortly. Originally it was planned to take 6 months to strengthen the bridge, then it was due to re-open on 1 October, so if it re-opens before then, which it should, the repair gang will be able to claim to have finished the job early, even though it will be about 6 weeks over the original schedule!